July 30, 2003:
The frame is enclosed and the rough plumbing and electrical work is in progress.
The cement for the garage floor was recently laid. Here are views from the
front,
from the
back,
and an interior shot showing the
framework.
Sometime in September 2003:
Lots of interior work in progress. Here are two stages of the
kitchen area:
first,
with cabinets installed (the rightmost base unit arrived with doors in the
wrong style), oak floor installed but not yet urethaned, some painting done;
second,
with countertop installed and lighting fixtures installed, not long afterwards.